References

Automation and monitoring work:

  • HA1 Specific Services and General Services Rm Valcea Hydro-electric Power Plant 2*23MW- Kaplan
  • HA2 Specific Services and General Services Babeni Hydro-electric Power Plant 2*18,5MW- Kaplan
  • HA1 Specific Services Turnu Hydro-electric Power Plant 2*35MW- Kaplan
  • HA1 Specific Services and General Services Dragasani Hydro-electric Power Plant 2*22,5MW- Kaplan
  • HA2 Specific Services Govora Hydro-electric Power Plant 2*22,5MW- Kaplan
  • General Services Strejesti Hydro-electric Power Plant 2*25MW- Kaplan
Modernization of dam electrical equipment - automation and monitoring:

  • Dam of Valcea Hydro-electric Power Plant 2*23MW – exhausted flow
  • Dam of Turnu Hydro-electric Power Plant 2*35MW – flow
  • Dam of Poiana Rusca Hydro-electric Power Plant 2*23MW – flow
Monitoring of general equipments of 0,4kV - Monitoring of equipments of 220Vcc

  • Turnu Hydro-electric Power Plant 2*35MW- Kaplan
  • Raureni Hydro-electric Power Plant 2*24MW- Kaplan
  • Govora Hydro-electric Power Plant 2*22,5MW- Kaplan
TRAFO automation and supervision system power (10 ÷ 130 MVA)

  • Petrimanu Pumping Station 25MVA
  • Jidoaia Pumping Station 16MVA
  • Lotru Downstream Pumping Station 16MVA
  • Malaia Hydro-electric Power Plant – Lotru EU 25MVA
  • Bradisor Hydro-electric Power Plant
Flows - levels automation and monitoring equipment:

  • Malaia Hydro-electric Power Plant
  • Valcea Hydro-electric Power Plant
  • Turnu Hydro-electric Power Plant
  • Gura Lotrului Hydro-electric Power Plant
Automation and monitoring equipment for cooling water pre-filter system:

  • Babeni Hydro-electric Power Plant
  • Turnu Hydro-electric Power Plant
  • Dragasani Hydro-electric Power Plant
  • Govora Hydro-electric Power Plant
Bistrita Pumping Station

Automation and radio communication

The Hydro-aggregates centralized control of the Iron Gates I

  • Joint Control, complementary works within the Iron Gates Station I of 400/200kV – 6*85MW
Studies, Research, Design:

Monitoring system for technical status of the Compensating Coil, from the Darste Station of 400kV
Studies of the possibility of implementing the electrical equipments (current transformers, flow sensors, spherical electro-valves, level translators, programmable robots, etc.) with the view of TRAFO 130 MVA automation and monitoring – Bradisor Hydro-electric Power Plant Lotru EU.

The elaboration of the documents of Feasibility study, Technical project, Specifications for the hydro-aggregates centralized control of the Iron Gates I – Joint control, complementary works within the Iron Gates I Station of 400/200kV SF –  PT + CS

Hidroelectrica

Contrastive study on the solutions used for automation systems of the Hydro-electric Power Plants within Hidroelectrica

Schemas of the secondary equipping with the view of their monitoring/automation

  • Studies on solutions for creating a system for measuring the level of the water on the exhaust gallery within the Tismana Upstream Hydro-electric Power Plant – 2*60,5MW Pelton

Others

  • Feasibility Study on the rehabilitation of the water network monitoring system – AQUATIM
Electrical Station of 110kV monitoring - SIMATIC Engineering System:
  • Valcea Hydro-electric Power Plant
  • Govora Hydro-electric Power Plant
Design, creation of PIF application software for AAR:
  • Urechesti Station Transelectrica Station in Craiova
Data insertion at SCADA high level (Dispatching)

Dispatcher level with the view of the remote control

  • Valcea Hydro-electric Power Plant
  • Turnu Hydro-electric Power Plant
  • Station of 110kV

 

Data insertion at SCADA high level (Dispatching) – Lotru EU
Latorita Interception
MHC

Flows – levels automation and monitoring equipment Malaia Hydro-electric Power Plant in control room Bradisor Hydro-electric Power Plant and Lotru EU